The ceilings are interior finishing material that should be considered during the installation of this product. At assembly is subject to certain temperature. In order to prepare materials for the change of temperature, plates should be within 24 hours to be in the room in which they are installed. The room in which installation will be suspended ceilings, must be dry, glazed, and if need be, and heated. If necessary, you can transfer the installation plate at a later date when the building will be dry and heated. If work schedule does not allow this, you can perform the assembly in two stages: first mount the support structure, and then install the plate. You must use one firm suspension systems (components from different manufacturers are not joined).
1. The tools needed for assembly.
Chalk, a measuring instrument (meter, tape measure), hammer, pencil, shoe knife, goggles, metal shears, pliers, level of not less than 61 or 122 cm, roll of twine or thin wire.
2. Security measures at work.
Use safety goggles, and gloves. Ceiling tiles are made of material which includes mineral and glass fibers, which can lead to skin irritation. Do not rub irritated skin. After working with the ceiling tiles need to wash your hands with soap and water. Wash clothes separately should be thoroughly rinsing.
3. The elements of the suspension system.
1 - basic guide length 3.6 (3.7) m, 2.3 - intermediate-length 0.6 and 1.2 m, 4 - trim moldings, corner length 3.0 m, 5 - suspension.
4. Creating a room.
Pre-make a plan of your premises on a sheet of paper. Be mounted on the ceiling so that the plate on opposite sides of the room were the same size. It is recommended to design the ceiling so that the size of the panels adjacent to the walls, was not less than ½ the size of the entire panel. To calculate the size of the outer panels can use the following formula: length of the wall is divided by the length of the plate entirely. Then added to the residue of division plate length and divided by 2. It turns out the size of the outer plates.
Example: Width 2745mm room. Plate length 600mm. 2745: 600 = 4 with a remainder of 575. Add the length of the slab: 575 600 = 1175 and divide by 2. 1175: 2 = 587.5.
5. Installation of wall moldings.
Install trim (rake 3.0) around the perimeter of the room at the right level of the ceiling, taking into account the space needed for lighting, ventilation and other equipment. Strengthen the corner is recommended 400mm increments.
6. Install hangers.
The number of suspensions is necessary for installation can be calculated by the formula Skomnaty / Splity x 0.5. On average, using ~ 2 - 4 hanging on the rail.
Mounting hangers produce the points of intersection with intermediate rails (as planned). Mounting hangers made with metal anchors with a diameter of the cap at least 13 mm. At the installation location (raster and lighting, fans, air conditioning, etc.), install additional suspensions.
7. Suspension main runners.
Trim the end of the main rail (rail 3.6) so that the intermediate rail (rail 1.2) was included in the guide groove of the main at a distance equal to the length at appropriate plates. The main guiding edge of the cut-off should be based on the baseboard trim corner. At the junction of the main rails install additional hanger. Hang up the main guide. Make sure that the basic and intermediate rails docked at right angles.
Adjusting the height of the ceiling battens used with the quick-clip.
8. Install intermediate guides.
Insert all the intermediate rails between the major carriers, with an interval equal to the width of the slab. Intermediate rails, connection to baseboard, cut to size, so that one end was inserted into the groove of the main track and the second went on-line trim moldings.
9. Installation of ceiling tiles.
Installation of ceiling tiles start from the middle of the room, ie Lay all the whole first plate. Then cut the size of plate, adjacent to the walls, and install them. Measure each plate! If there are no other recommendations, the edges of plates that are adjacent to a wall plinth, it is necessary to cut out the shape with hand tools. Where visible cut edges of plates, you must handle them manually, but usually along the perimeter do not necessarily. If the ceiling does not require fire protection or fire-resistant buildings, there is no need to use the locking clip, unless there are special recommendations.
Maintenance and cleaning of ceiling mounted using mineralovoloknistyh plates.
Service suspended ceilings can be started only after the full impact will be assessed on the characteristics of such an operation established products. False ceilings shall not require more maintenance effort than the painted ceilings. However, if demand for service does arise, then, for further exploitation ceilings and attractive appearance of the conservation need to follow certain guidelines:
First, remove the dust accumulated on the surface with a soft brush.
Pencil marks, smudges, etc. can be removed using conventional rubber eraser.
This can be done using a damp cloth or sponge moistened with an aqueous solution of mild soap or diluted detergent.
The sponge should be well depressed. The ceiling should not be wet.
After the end of treatment to remove soap film with a cloth or sponge, rinsed with clean water and wrung out as follows.
Do not use abrasive cleaning agents.
Recommendations contained in this manual are based on years of experience of the manufacturer. However, these data are not safeguarded and are not binding.
1. The tools needed for assembly.
Chalk, a measuring instrument (meter, tape measure), hammer, pencil, shoe knife, goggles, metal shears, pliers, level of not less than 61 or 122 cm, roll of twine or thin wire.
2. Security measures at work.
Use safety goggles, and gloves. Ceiling tiles are made of material which includes mineral and glass fibers, which can lead to skin irritation. Do not rub irritated skin. After working with the ceiling tiles need to wash your hands with soap and water. Wash clothes separately should be thoroughly rinsing.
3. The elements of the suspension system.
1 - basic guide length 3.6 (3.7) m, 2.3 - intermediate-length 0.6 and 1.2 m, 4 - trim moldings, corner length 3.0 m, 5 - suspension.
4. Creating a room.
Pre-make a plan of your premises on a sheet of paper. Be mounted on the ceiling so that the plate on opposite sides of the room were the same size. It is recommended to design the ceiling so that the size of the panels adjacent to the walls, was not less than ½ the size of the entire panel. To calculate the size of the outer panels can use the following formula: length of the wall is divided by the length of the plate entirely. Then added to the residue of division plate length and divided by 2. It turns out the size of the outer plates.
Example: Width 2745mm room. Plate length 600mm. 2745: 600 = 4 with a remainder of 575. Add the length of the slab: 575 600 = 1175 and divide by 2. 1175: 2 = 587.5.
5. Installation of wall moldings.
Install trim (rake 3.0) around the perimeter of the room at the right level of the ceiling, taking into account the space needed for lighting, ventilation and other equipment. Strengthen the corner is recommended 400mm increments.
6. Install hangers.
The number of suspensions is necessary for installation can be calculated by the formula Skomnaty / Splity x 0.5. On average, using ~ 2 - 4 hanging on the rail.
Mounting hangers produce the points of intersection with intermediate rails (as planned). Mounting hangers made with metal anchors with a diameter of the cap at least 13 mm. At the installation location (raster and lighting, fans, air conditioning, etc.), install additional suspensions.
7. Suspension main runners.
Trim the end of the main rail (rail 3.6) so that the intermediate rail (rail 1.2) was included in the guide groove of the main at a distance equal to the length at appropriate plates. The main guiding edge of the cut-off should be based on the baseboard trim corner. At the junction of the main rails install additional hanger. Hang up the main guide. Make sure that the basic and intermediate rails docked at right angles.
Adjusting the height of the ceiling battens used with the quick-clip.
8. Install intermediate guides.
Insert all the intermediate rails between the major carriers, with an interval equal to the width of the slab. Intermediate rails, connection to baseboard, cut to size, so that one end was inserted into the groove of the main track and the second went on-line trim moldings.
9. Installation of ceiling tiles.
Installation of ceiling tiles start from the middle of the room, ie Lay all the whole first plate. Then cut the size of plate, adjacent to the walls, and install them. Measure each plate! If there are no other recommendations, the edges of plates that are adjacent to a wall plinth, it is necessary to cut out the shape with hand tools. Where visible cut edges of plates, you must handle them manually, but usually along the perimeter do not necessarily. If the ceiling does not require fire protection or fire-resistant buildings, there is no need to use the locking clip, unless there are special recommendations.
Maintenance and cleaning of ceiling mounted using mineralovoloknistyh plates.
Service suspended ceilings can be started only after the full impact will be assessed on the characteristics of such an operation established products. False ceilings shall not require more maintenance effort than the painted ceilings. However, if demand for service does arise, then, for further exploitation ceilings and attractive appearance of the conservation need to follow certain guidelines:
First, remove the dust accumulated on the surface with a soft brush.
Pencil marks, smudges, etc. can be removed using conventional rubber eraser.
This can be done using a damp cloth or sponge moistened with an aqueous solution of mild soap or diluted detergent.
The sponge should be well depressed. The ceiling should not be wet.
After the end of treatment to remove soap film with a cloth or sponge, rinsed with clean water and wrung out as follows.
Do not use abrasive cleaning agents.
Recommendations contained in this manual are based on years of experience of the manufacturer. However, these data are not safeguarded and are not binding.